University of the District of Columbia Turf Field

Location

Washington, DC

Size

2.1 Acres

Kramer provided construction management services for improvements to the existing grass lacrosse & soccer field on the University of District of Columbia’s Van Ness campus. The grass was replaced with artificial turf, and additional upgrades included LED field lights, new fencing, new bleachers, covered player benches, a new scoreboard, and a new sound system. A new ADA ramp was installed to improve access to the field and seating area. A large concrete cantilevered retaining wall was installed at the west border of the field on the hillside between UDC and the bordering embassy buildings to address the steep grade. A Heritage Tee was relocated on the property in order for the field to be regulation size.

Quinn Evans Architects designed the project in 2016 however the construction did not begin until May 2022. Due to the time between the design and actual construction, there were a few obstacles Kramer led the team in finding solutions to. These included an unplanned Heritage Tree was preventing the field from being regulation size and was relocated within the property. The retaining wall was redesigned due to the tree, and steel fabrication lead times impacted the schedule and completion. The field was completed in May 2024.

Related Projects